§ 157.28. Construction east of coastal construction control line.


Latest version.
  • Notwithstanding any other provision or section of this chapter to the contrary, the following conditions shall apply to all construction east of the Coastal Construction Control Line (CCCL):

    (1)

    Before a town building permit shall be issued for any construction east of the State of Florida CCCL, as that line now exists or may exist in the future, all necessary state permission and permits must be obtained by the person proposing the structure. This requirement shall not preclude simultaneous processing of applications for construction east of the CCCL at the local level; and

    (2)

    All applications for construction east of the CCCL, along with staff comments, Board action where required, and all necessary state permission and permits shall be forwarded to the town council for final action.

(Ord. 336, 2-27-86; Ord. 357, 5-28-87)

Cross reference

Penalty, § 10.99.